Page 1 of 1

CDS Vignette Attempt -

PostPosted: Sat May 23, 2015 4:57 pm
by te_mcg
Here's my third attempt at the CDS vignette - see anything amiss?

I'm unsure about drawing the footings - are they supposed to go to the top of the slab or the bottom? Does it matter?

Re: CDS Vignette Attempt -

PostPosted: Mon May 25, 2015 7:16 pm
by Adadadad
Supposedly either top or bottom of slab, according to ncarb g+
https://plus.google.com/117247743507650 ... iuisZ4U525
But everyone here seems to do bottom of slab on grade. Literally, slab on grade


can't immediately verify the joist/duct height combos... but looks alright.
graphically speaking, take a look at some of my notes:
viewtopic.php?f=10&t=30016

Have you switched the cad file to do the 3.1 vignette yet?

Re: CDS Vignette Attempt -

PostPosted: Thu May 28, 2015 7:59 pm
by te_mcg
I did try the 3.1 vignette - attached. I think I have the duct clearance wrong in the Meeting Room. I thought the duct clearance was established by the largest duct on the floor, but I guess I'm confused what happens at the higher ceiling'd spaces. Do you use the clearance for the 2nd floor? or just the largest duct in the higher space?